An hour-by-hour look at the quickturn fabrication process.
We were presented with a challenge: Is it possible to build 10 prototype 12-layer boards in 72 hours? It wasn’t a rhetorical question; a customer really wanted just such an order. So, with time at a premium, our engineers put their heads together and created a “plan of attack” that optimized all resources. One key to success is performing a number of the steps in sequence as needed, so panels are ready when they are required. We’ll describe the procedure hour-by-hour as follows:
Hour 1: The CAM operator runs a DRC (design rule check) process and accepts or rejects the data files. If a problem exists, they contact the buyer to work out a solution; e.g., if two traces are too close, and one needs to be moved. Once the data file is accepted, the next action is to set up the innerlayers.