Nortel Creditors Call for Changes to Nokia Sale Print E-mail
User Rating: / 0
PoorBest 
Written by Administrator   
Tuesday, 30 June 2009 14:08
SAN JOSE -- Flextronics is among several Nortel Networks creditors calling for changes to the beleaguered telecom OEM's planned sale of certain wireless assets to Nokia Siemens Networks.

The Nortel-Nokia Siemens deal is worth some $650 million, which Nortel desperately needs to exit bankruptcy. But the creditors could hold up or cancel the deal, pending changes to the auction for the company's CDMA and LTE wireless assets.

Among their chief complaints: The $22.5 million breakup fee owed to Nokia Siemens, should Nortel sell the assets to someone else, and a term that permits Nokia Siemens to see competitors' bids. The creditors claim the rules unfairly handicap other potential bidders.

Nortel said it had one other bid besides the offer from Nokia Siemens. The Nokia Siemens deal is expected to close in July, pending other offers. According to reports, Nortel's creditors want the auction to last at least 15 more days in the hopes of generating additional bids.

Flextronics heads the major US creditors committee. The EMS firm makes a reported 70% of Nortel's equipment.
blog comments powered by Disqus
 

Products

Lista Presents Arlink 8000 Modular Workstation
Arlink 8000 modular workstation system is ergonomically designed for assembly, service, repair, research and technical work. Can be assembled and reconfigured quickly. Can be configured in a variety of heights and lengths to best suit specific needs. Comes in five standard industry widths and in three different heights up to 84".  Has a starter and adder system, with the option of back-to-back configurations; enables unlimited layout possibilities. The definite positioning system makes relocating or adjusting work surfaces, storage, shelving, lights, power beams, footrests, etc. easy. Has a...

Search

Search

Login

CB Login

Language

Language

English French German Italian Portuguese Russian Spanish
 

Features

Printing Screens Revisited
  Research continues on improving printed frontside silver conductor line efficiency.A simple Internet search will reveal the photovoltaic industry is working hard on higher aspect ratio frontside conductor grids as a route to greater solar cell efficiencies. This is because the conductors, typically screen-printed on a cell’s frontside, block sunlight from reaching the energy converting strata below, and the narrower they are, the less shadow they cast. However, as it is essential they...

Current Issue

March 2010 cover

Parts


Find and quote components




Powered by


Terms Of Use

Printed Circuit Design & Fab Magazine on Facebook