Home arrow News arrow Design News arrow Gartner Sees 15% Dip for IC Gear Spending in '05
Part Search

NEW!
Find and quote components





Powered by


Terms Of Use

Gartner Sees 15% Dip for IC Gear Spending in '05 Print E-mail
Written by Mike Buetow   
Thursday, 16 December 2004

STAMFORD, CT, Dec. 16, 2004 — Worldwide semiconductor capital equipment spending is on pace to grow 61% in 2004, but next year's spending is projected to drop 15, according to Gartner Inc.

"The emergence of excess inventories, macroeconomic uncertainty and slowing end-user demand casts a shadow over the outlook for 2005," said Klaus Rinnen, vice president for Gartner's semiconductor manufacturing and design research group. "Device production has slowed in recent months, and with it semiconductor manufacturers have readjusted their capacity ramp-up and equipment purchase plans."

All major segments of the capital equipment market are forecast to decline in 2005 except for the automated test equipment market, which is expected to grow 3%, followed by a 30% drop in 2006. Gartner analysts said the industry is in a downcycle, but this period will be shorter than the prior one in 2001.

"Given more modest-capacity investments during the cycle, the supply-demand imbalance will be far less severe than in the prior two cycles," Rinnen said. "Consequently, the approaching downcycle will be mild, allowing for a return to positive annual investment growth possibly as early as 2006."

Worldwide semiconductor wafer fab utilization rates peaked in the second quarter at 94.9% before dropping to 91.3% at the end of the third quarter, as semiconductor manufacturers trimmed production levels in response to excess inventories.

"By the middle of 2004, capacity caught up with demand, and excess capacity started to emerge," Rinnen said. "However, any excess capacity during this down period will be considerably less than in prior downward cycles, and utilization rates will decline only to about 85% before starting a gradual increase through 2006."

The packaging and assembly equipment market will fall 22% in 2005, to about $3.5 billion. Growth will be limited to packaging lithography and flip-chip bonder tooling. Packaging utilization rates will likely bottom out in the second half of 2005, giving way to a pickup in orders by the end of the year or very early in 2006.

Gartner analysts said the automated test equipment market will experience a slight increase due to the continued growth of test outsourcing, and the remaining strength of semiconductor assembly and test services providers.


Comments
You are not authorized to leave comments. Please login first.


Sponsor Links

Free Product Evaluation:
Experience industry-leading PCB design tools, handling advanced technology designs. Reduce your design spins and increase manufacturing quality. Evaluate today!


Need PCB prototypes fast?
Sunstone Circuits takes the pain out of prototyping! We are dedicated to making the online ordering of PCB prototypes simple, fast, and easy from quote to delivery. Quick access to our 24/7/365 customer service team and easy online order tracking takes the pain out of sourcing prototypes online.
Put us to the test - order Sunstone Circuits today!


PCB systems design teams face challenges with IP management and collaboration across multiple groups. This free Webinar highlights best practices that optimize these efforts across the design flow. Learn more!

Classifieds


New Product
Development Kit Test Drives Innovative Cable Assemblies
3M introduces the Shielded Controlled Impedance (SCI) Cable Assembly Development Kit, 2mm. The development kit enables users to assess, test and design high-performance, 2mm SCI cable-to-board solutions. Engineers can attain multi-gigahertz performance from 2 mm printed circuit board connectors using 2mm shielded controlled impedance cable assemblies.
 
The SCI connectors save board space without affecting performance. Users can verify signal integrity, impedance matching and crosstalk performance for designs requiring up to 1 Gbps single-ended performance per signal line or 5 Gbps differential performance per signal pair.
 
The kit contains everything needed to assess, test and design, including a CD-ROM with application note, test instruction and technical sheets.
 
www.3m.com
Copyright © 2008 - This site contains copyrighted material that cannot be reproduced without permission.
Powered by Webtising