| Bridging at Reflow |
|
|
What causes it, and can it be eliminated?One area of the surface mount assembly process that frequently causes defects and subsequent rework to fix the problem is bridging on gullwing devices during reflow. The subsequent rework costs money, time and solder joint reliability, all of which have a direct impact on quality, whether it is functional failure of the assembly, cost overruns or missed shipments. Eliminating rework is the goal, but is it really possible? In the case of bridging on gullwing devices at reflow, the answer typically is “yes.”
In extreme cases, the solder paste volume reduction is more than 50%. In the majority of cases, the volume reduction is 25% to 40%. In all cases, the amount of solder paste volume reduction depends on a size comparison of the foot and the PCB land pad, as well as the solder paste stencil thickness. Robert Dervaes is vice president of technology at FCT Assembly (fctassembly.com) This e-mail address is being protected from spambots. You need JavaScript enabled to view it . |
Design News
- IPC, PCB Libraries Team on Library Tools for Design Standard
- Mentor, Tezzaron Optimize Calibre 3DSTACK for 3D-ICs
- FabStream, ADI Offer Digi-Key Parts Library
- DRAM Market Getting Tight
- Ansys Sets Q1 Revenue Mark
- EI SiP Meets Missile Interceptor Challenge
- Sweden to Host SI Workshops
- Altium Signs Fisher/Unitech as Midwest US VAR
- NI's Revenue Jump Can't Save Profits
- 2013 PCD&F NPI Design Awards Open
Market News
- Phones, TVs Boost Printed and Flexible Electronics Sales
- Medical Electronics Market to Double, Offering Ample Opps for EMS
- IT Market Being Pulled Down by PC Sluggishness
- Tablet Sales Surged in Q1
- Smartphone Shipments Up 38% in Q1
- IPC: March PCB Orders Down 2.3%
- Solid Forecast for Enterprise Network Equipment Spending
- IC, Packaging Sales to Grow through 2017
- Driver-Assist Systems Market Going Fast on Own
- Study Says US on Track to Compete with China on Cost
Fab News
- Camtek’s Q1 Revenue Nearly Flat at $18.1M
- Enthone Parent Sees Pickup in PCB Demand
- SMTA, IPC to Co-locate Fall Events
- LPKF Posts Q1 Revenue Up 60%
- Despite Sequester, Aurora Circuits Reports Q1 Sales Up 12%
- Rogers Restructuring to Cut Annual Spending by $12M
- DoD to Propose Changes to Counterfeit Electronics Procurement Practices
- Cambridge Nanotherm to Build 1st Manufacturing Plant
- Ex Jisso Members Re-Form Under CAMEST Banner
- April Not Cruelest Month for Park
Products
Vault 1.1 features enhanced searching and filtering tools and design bill of materials for easy-to-use component navigation.
Features
A series of workshops next month on compliance with RoHS and other directives will help US companies looking to break into the European market.



